top of page
  • Facebook Social Icon
  • LinkedIn Social Icon

Traffic Operations

Guidelines for Installing Pedestrian Treatments at Midblock Locations

​

PI: Priyanka Alluri

Funding Agency: Traffic Engineering and Operations Office, Florida Department of Transportation

Award Amount: $150,000

Project Duration: 2019 - 2020

​

Description: The goal of this project is to assist the Department in reducing pedestrian crashes at midblock locations in Florida. This project will conduct spatial analysis to identify specific arterial corridors that are prone to pedestrian crashes and recommend specific pedestrian treatments to be installed at these locations. This project will also develop specific guidelines to assist in selecting the corridors and the specific pedestrian treatments for improving pedestrian safety.

Miami Beach Citywide Pavement Marking Study

​

PI: Priyanka Alluri

Funding Agency: City of Miami Beach

Award Amount: $16,125

Project Duration: 2019 - 2020

​

Description: The main objective of this study are to evaluate the visibility and the existing durability of the crosswalks and bicycle lanes in the City of Miami Beach, Florida. This project is conducted to identify and prioritize the crosswalks and bike lanes at signalized intersections and road segments, respectively, for restoration. All the crosswalk and bike lane pavement markings along 15.7 miles of roadway corridors in the City of Miami Beach are to be evaluated based on their visibility and durability.

Contact Us

Thanks for submitting!

10555 West Flagler Street EC 3720, Miami, FL 33174

Tel. (305) 348-3485

© 2020 TOPS Lab FIU. All rights reserved.

​

bottom of page